I talked to Rich recently and he had this to say, " We have been working a jpipe for the Ridgeline and it will be ready soon. There have been some hiccups with the production of our V2 AWD j-pipes. The tight radius bending die needed to be repaired and modified. We are on track now and should have some production ready samples in a week or so. Stay tuned!" I know there has been a following of these for the past several years so hopefully this is it!:act035: